N
Luxe Celebrity Review

Starlight train now cancelled from Sacramento to Klamath Falls with bus bridge - Trains Magazine

Author

Daniel Johnston

Updated on April 07, 2026

 

timz

Have you seen the pics of the damage? Nothing is going to be running Black Butte to Klamath Falls in ten days.

Rumor: UP isn't going to fix the bridge -- they're replacing it. 

Wonder if the present cooper rating is not what UP desires ?  If so they probably already had plans of what was needed.   The biggest problem is if UP is replacing the bridge is getting the proper steel for the rebuilding ?  Foundations probably woulde not be a problem  New foundations can be installed while waiting for the steel?

Wonder if UP would not allow 4014 across the bridge ?